Its hard to move fast when the weather has a hard time cooperating! Nevertheless things are moving- just not a quickly as we had hoped for February! Justin has been working hard and in the last couple weeks he has gotten a few things checked off the list-
✔ Started shingling the roof. Southside and East side done! Now he needs to wait until it warms again to work on the Northside and West side (which is the hardest of our roof line and it connects to the Garage roof)
Why is he doing this not in the summer?? Before we can drywall or insulate it has to stop leaking on the inside. The titan walls have done a good job protecting the inside- but it still needs to be water tight before we can move on with some of the inside.
✔ Master tub and stand alone filler arrived!! I was questioning Justin as to why we had to decide on this a couple weeks ago- but apparently the plumber needs these measurements to do his rough in. We totally switched around the entire master bath in January and we both felt really good about it! The tub is for a single person- and not large by any standard- but its enough for me :) Justin has this thing about "stewing in his own filth" so the bath is for ME!